N5
Nanhua LM100 Medium Intensity Aviation Obstruction Light
Nanhua LM100 Medium Intensity Aviation Obstruction Light
SKU:LM100-E1-V20
Couldn't load pickup availability
Delivery
Delivery
Singapore
1-3 work days ( 90% of Shipments)
For items that are stocked outside Singapore, it takes 7 - 14 work days.
International
7-14 work days.
Pick FEDEX at checkout for reliable and Fast Deliveries.
Taxes
Taxes
Singapore
GST Not Applicable - Prices displayed are final prices.
International
As per importering country's Duties and taxes. To be paid to Carrier or Customs Dept. Importer is responsible for Import Duty and Taxes.
Contact Us
Contact Us
cs@delight.com.sg
Tel: +65 6429 8402
Whatsapp: +65 8900 0895
We admit ! For Technical Clarifications, our AI BOT is Quicker than us. Try it !
Share
Technical Details:
**Ships from China - 5 to 6 weeks lead time**
Products description and application:
LM100 series medium intensity aviation obstruction light Type B has been
awarded the FAA,ICAO,CAAC certification.
Medium intensity type B is used to mark the constructions for aircraft warning
at night. Red at night and steady burning /flashing working mode.Combined
with advantages of advanced LED, optics and system control technology to
satisfied the harshest applications.
Applying to the air traffic warning areas such as towers( Telecom,GSM),
smokestacks (heat-engine plant, coking plant chemical plant etc.),buildings,
port devise, construction machinery, wind power generator etc.
Applying to the 45-90m obstacle or on 45m -90m position of big obstacle.
Applying to outside environment.
Applying to high salt area.
Features:
o Die-cast aluminum housing, surface electrostatic powder sprayed yellow,
o LED light source, life span up to 100000h.
o Three-profiteering design(Waterproof, shockproof, dust proof)
o Use UV resistant, shock resistant PC lampshade.
o Switchable work mode:steady burning /flashing (support field configuration)
o With fault alarm inspection and fault alarm output. ( Normally on/off
optional)
o Professional EMC design,Anti-electromagnetic interference.
o Professional optical design
o Lightning protection up to 10kv
o Optional GPS function
Installation method of use:
• Make sure the light on a smooth surface which has enough strength, if there is no mounting surface, we can
customize special mounting bracket as request.
• Open the 3 hasps on the bottom, turn around the light, Exposed terminal row.
• Access the power cord from the waterproof joint, Correctly connect the power signal wire and the ground wire according to the terminal
definition on the label.
• After finishing the connection, fasten the buckles. Check whether the power cables are connected correctly before power on.
• GPS synchronization test should be in the outdoor environment without any block. Synchronization takes about 15 minutes (Only suit
for the type of synchronization with GPS).
